Following the replacement of the hatch frame work inside the Post has resumed, cleaning and painting being the priority. All telecoms wiring and equipment has been removed and will be reinstalled once the woodwork has been painted. The flourescent light has been repaired and is ready to be refitted. Progress may be slow but we are heading in the right direction. Work on rewiring the post for refitting the WB1400 and Teletalk is progressing well with hidden sockets being added as no equipment will be left down the post.
Home » Uncategorized » Onwards and downwards.
All the telecoms wiring in the Post has now been replaced, the incoming BT is yet to be changed but will need some serious digging in the summer. Initial testing shows the 3G system for connecting to 28 Group Control in Dundee is a great success.